Lock Bulk Quality at Sample Approval
A single approved sample means nothing until it's written into a binding production standard — materials, process, and tolerances.
- Insist on a pre-production sample pulled from the real production line — not a handmade one
- Lock materials, process, and tolerance standards into the contract when the sample is approved
- Require mid-production photos or video, plus a final random-inspection report